国产午夜精品一区理论片飘花,亚洲av永久纯肉无码精品动漫,国产成年无码久久久久毛片,国产欧美一区二区精品性色

Welcome to the official website of Shenzhen Ledfocus Precision Manufacturing Co., Ltd.!
News
Company news

Where are you now:Home >> News >> Company news
Detailed requirements of PCBA processing for workshop environment
Time:2021-11-17 Read: 2171

The workshop is the main artery of the PCBA factory, and most of the consumption and processing must be stopped inside the workshop. Regarding a PCBA factory, the environment of the workshop and the quality of its personnel are the key to highlighting its corporate culture and excellence. So today, let's walk into the workshop and understand the requirements of PCBA processing on the workshop environment and personnel.


PCBA processing PCBA consumer equipment and SMT patch processing technology have certain requirements for the workshop's power supply, ventilation ability, temperature, humidity, air cleanliness, anti-static, and consumer wear accessories. In addition, the workshop environment tends to be clean and tidy, in order to reduce the harm to the health of workshop workers such as oil and dust. At the same time, environmental protection and greening are the pursuits and goals of modern development. The reason is that the environment of greening and greening can reduce or control the generation of pollution sources. It can be seen that the material particles are relatively large, which mainly affects the visibility in the workshop, which affects the operation of the workers in the workshop and the supervision of management personnel. At the same time, visible particles often greatly reduce the service life of the air-conditioning system and the equipment in the workshop.


Detailed requirements of PCBA processing for workshop environment

1. Temperature and humidity request

For the normal operation of the equipment and the high specification requirements for the production process, the environment temperature of the workshop is best controlled at 23±3 degrees Celsius, and the relative humidity is best when the relative humidity is 45%-70%RH.


2. Ventilation ability

Both reflow soldering and wave soldering equipment have exhaust and flue gas exhaust requirements, and the exhaust fan should be configured according to the equipment requirements. Regarding the full hot blast stove, the minimum flow rate of the exhaust duct is generally required to be 14-15m/min.


Three, power request

The power supply voltage and power meet the requirements of PCBA processing equipment. The voltage is stable, and the general request is single-phase AC220V (220±10%, 50/60Hz), three-phase AC380V (380±10%, 50/60Hz). If the request is not met, a regulated power supply is required, and the power supply is greater than the power consumption of the device. The power supply of the placement machine requires independent grounding. Generally, a three-phase five-wire wiring method should be adopted. Due to the high speed of the placement machine, it is easy to produce electromagnetic interference when connected with other equipment, which affects the normal operation and placement accuracy of the placement machine.


Four, static protection request

The IC and other fine electronic components touched in PCBA production are often easily damaged by static electricity. Therefore, static protection is also very important. Usually, people entering the workshop must wear anti-static overalls and work caps. Shoes need to be covered with shoe covers. Anti-static bracelet.


The workshop is the center of the PCBA factory and the "home" that most of the staff rely on. It is the factory's inescapable obligation to ensure the well-being of the staff. It is indispensable and important to regularly request training for the workshop environment and personnel for small batch PCBA proofing. Link.


The above is an introduction to the requirements of PCBA processing on the workshop environment. I hope to help everyone. At the same time, if you want to understand more PCBA processing information, you can pay attention to the update of Leading Proofing.

Contact Us
Shenzhen Ledfocus Precision Manufacturing Co., Ltd.

Address: Room 1204, Dahong (Xinqiao) Science and Technology Innovation Park, No. 48, Xinyu Road, Shajing Street, Baoan District, Shenzhen

Phone: 0755-29727486 0755-83734215 0755-83734236

Person in charge: Mr. Fan 13088821718

Email: roman@leikashi.com

Business section #605

Email: allen@leikashi.com

Website: www.yhn567.com

Service hotline
0755-83734236
? 2020 Shenzhen Ledfocus Precision Manufacturing Co., Ltd. All rights reserved 粵ICP備2021139374號
  • Links:
欧美性猛交XXXXX按摩欧美| 久久久久久av无码免费网站下载| 我和麻麻啪啪小说合集| 国产AV一区二区精品凹凸| 嫩模超大胆大尺度人体写真| 女自慰喷水免费观看WWW久久| 高h秘书不许穿内裤1v1| 高清播放器欧美大片| 亚洲国产精品无码久久一线 | yyy6080韩国三级理论| 特黄做受又粗又大又硬老头| 少妇私密会所按摩到高潮呻吟| 人妻无码| 久久人妻无码精品一区二区三区 | 精品国产乱码久久久久久毛片| 被滋润的娇妻疯狂呻吟| 午夜香吻免费观看视频在线播放| 国产精品秘入口18禁麻豆免会员| 亚洲樱花大片| 人禽伦免费交视频播放 | 东京无码熟妇人妻av在线网址| 亚洲一区二区三区无码久久| 巜年轻的公和我做愛| 无码人妻AV一二区二区三区| 亚洲H在线播放在线观看H| 漂亮人妻被修理工侵犯| 国产一区二区三区成人欧美日韩在线观看| 中文字幕一精品亚洲无线一区| 黑人刚破完处就三p| a级国产乱理伦片在线观看| 最近日本MV字幕免费高清在线| 艳妇荡岳丰满交换做爰| 意大利电影奸情| a级毛片无码免费真人| 欧美乱妇高清无乱码| 欧美性xxxxx极品老少| 宝贝小嫩嫩好紧好爽h| 日本成本人片免费高清| 久久久久久人妻毛片a片| 在线精品国产一区二区三区| 深爱婷婷老司机av视频|