国产午夜精品一区理论片飘花,亚洲av永久纯肉无码精品动漫,国产成年无码久久久久毛片,国产欧美一区二区精品性色

Welcome to the official website of Shenzhen Ledfocus Precision Manufacturing Co., Ltd.!
News
Company news

Where are you now:Home >> News >> Company news
Detailed requirements of PCBA processing for workshop environment
Time:2021-11-17 Read: 2171

The workshop is the main artery of the PCBA factory, and most of the consumption and processing must be stopped inside the workshop. Regarding a PCBA factory, the environment of the workshop and the quality of its personnel are the key to highlighting its corporate culture and excellence. So today, let's walk into the workshop and understand the requirements of PCBA processing on the workshop environment and personnel.


PCBA processing PCBA consumer equipment and SMT patch processing technology have certain requirements for the workshop's power supply, ventilation ability, temperature, humidity, air cleanliness, anti-static, and consumer wear accessories. In addition, the workshop environment tends to be clean and tidy, in order to reduce the harm to the health of workshop workers such as oil and dust. At the same time, environmental protection and greening are the pursuits and goals of modern development. The reason is that the environment of greening and greening can reduce or control the generation of pollution sources. It can be seen that the material particles are relatively large, which mainly affects the visibility in the workshop, which affects the operation of the workers in the workshop and the supervision of management personnel. At the same time, visible particles often greatly reduce the service life of the air-conditioning system and the equipment in the workshop.


Detailed requirements of PCBA processing for workshop environment

1. Temperature and humidity request

For the normal operation of the equipment and the high specification requirements for the production process, the environment temperature of the workshop is best controlled at 23±3 degrees Celsius, and the relative humidity is best when the relative humidity is 45%-70%RH.


2. Ventilation ability

Both reflow soldering and wave soldering equipment have exhaust and flue gas exhaust requirements, and the exhaust fan should be configured according to the equipment requirements. Regarding the full hot blast stove, the minimum flow rate of the exhaust duct is generally required to be 14-15m/min.


Three, power request

The power supply voltage and power meet the requirements of PCBA processing equipment. The voltage is stable, and the general request is single-phase AC220V (220±10%, 50/60Hz), three-phase AC380V (380±10%, 50/60Hz). If the request is not met, a regulated power supply is required, and the power supply is greater than the power consumption of the device. The power supply of the placement machine requires independent grounding. Generally, a three-phase five-wire wiring method should be adopted. Due to the high speed of the placement machine, it is easy to produce electromagnetic interference when connected with other equipment, which affects the normal operation and placement accuracy of the placement machine.


Four, static protection request

The IC and other fine electronic components touched in PCBA production are often easily damaged by static electricity. Therefore, static protection is also very important. Usually, people entering the workshop must wear anti-static overalls and work caps. Shoes need to be covered with shoe covers. Anti-static bracelet.


The workshop is the center of the PCBA factory and the "home" that most of the staff rely on. It is the factory's inescapable obligation to ensure the well-being of the staff. It is indispensable and important to regularly request training for the workshop environment and personnel for small batch PCBA proofing. Link.


The above is an introduction to the requirements of PCBA processing on the workshop environment. I hope to help everyone. At the same time, if you want to understand more PCBA processing information, you can pay attention to the update of Leading Proofing.

Contact Us
Shenzhen Ledfocus Precision Manufacturing Co., Ltd.

Address: Room 1204, Dahong (Xinqiao) Science and Technology Innovation Park, No. 48, Xinyu Road, Shajing Street, Baoan District, Shenzhen

Phone: 0755-29727486 0755-83734215 0755-83734236

Person in charge: Mr. Fan 13088821718

Email: roman@leikashi.com

Business section #605

Email: allen@leikashi.com

Website: www.yhn567.com

Service hotline
0755-83734236
? 2020 Shenzhen Ledfocus Precision Manufacturing Co., Ltd. All rights reserved 粵ICP備2021139374號
  • Links:
中文字幕乱码无码人妻系列蜜桃| 久久精品国产亚洲av久| 亚洲欧美激情精品一区二区| 国产乱码精品一区二区三区香蕉| 77777亚洲午夜久久多喷| 老熟女交换五十路交换a片视频| 交换朋友夫妻客厅互换| 无码h黄肉3d动漫在线观看| 久久er99热精品一区二区| 久久久无码av精品亚洲a片软件| 美女裸体a级毛片| 老汉的性生生活1一7| 极品尤物一区二区三区| 亚洲va中文字幕| 人妻丰满熟妇av无码区免| 国产精品 视频一区 二区三区| 亚洲色欲色欲www在线播放| 野花免费观看高清在线4| 国产亚洲精品精品国产亚洲综合| 性裸交a片a∨天传媒公司| 亚洲精品无码专区久久久| 国产中年熟女高潮大集合| 亚洲欧美日韩久久精品第一区| 国产美女精品一区二区三区| 白丝小舞被调教的奶水直流| av无码久久久久久不卡网站 | 亚洲国产精品成人天堂| 欧美顶级少妇做爰hd| 国产精品久久777777| 欧美成人一区二免费视频| 亚洲国产婷婷香蕉久久久久久| 国产亚洲精品久久久久久小舞| 亚洲精品日韩片无码中文字幕| 丰满人妻熟妇乱又伦精品视频三| 国产成人精品亚洲777人妖| 我和虎狼之年的岳135章| 无码天堂亚洲国产av久久| 国产精品无码一区二区在线观一 | 变态抽搐顶弄h| 亚洲H在线播放在线观看H| 艳乳欲仙欲死在线观看|