国产午夜精品一区理论片飘花,亚洲av永久纯肉无码精品动漫,国产成年无码久久久久毛片,国产欧美一区二区精品性色

Welcome to the official website of Shenzhen Ledfocus Precision Manufacturing Co., Ltd.!
News
FAQ

Where are you now:Home >> News >> FAQ
What exceptions will occur during SMT production? Normally
Time:2021-10-08 Read: 2895

1. Ideal solder joints

It has good surface wettability, that is, the molten solder should spread on the surface of the welded metal and form a complete, uniform and continuous solder covering layer, and its contact angle should not be greater than 90


The correct amount of solder, the amount of solder is sufficient but not too much or too little

For a good welding surface, the surface of the solder joint should be complete, continuous and smooth, but it does not require a very bright appearance.

Good solder joint position The position deviation of the solder end or pin of the component on the pad is within the specified range.


2. No wetting

The contact angle formed by the solder on the solder joint and the surface of the welded metal is greater than 90


3. Open welding

The pad is separated from the PCB surface after soldering.


4. Suspension bridge (drawbridging)

One end of the component leaves the pad and faces the bag upright diagonally or upright


5. Bridging

The solder between two or more solder joints that should not be connected is connected, or the solder joints of the solder joints are connected with adjacent wires.


6. Welding

After soldering, electrical isolation sometimes occurs between the solder end or the pin and the pad


7. Draw the tip

There are solder burrs protruding outward in the solder joints, but they are not in contact with other conductors or solder joints


8. Solder ball

A small ball of solder that adheres to the printed board, the solder mask or the conductor during soldering.


9. Holes

Holes with different apertures appear in the weld


10. Position offset (skewing)

When the solder joint deviates from the predetermined position in the horizontal, vertical or rotational direction in the plane.


11. Visual inspection

With the aid of a magnifying glass of 2~5 times of the illumination, inspect the quality of PCBA solder joints with naked eyes


12. Inspection after aoldering

Quality inspection after PCB is soldered.


13. Reworking

Repair process to eliminate local defects of surface mount components.


14. Placement inspection

When surface mount components are mounted or after they are mounted, quality inspection is carried out for any missing, misplaced, mis-mounted, damaged, etc. conditions.


In SMT inspection, two methods, visual inspection and optical equipment inspection, are often used. Some only use the visual inspection method, and there are also two mixed methods. They can all inspect the product, but if the visual inspection method is used, people will always get tired, so there is no guarantee that employees will conduct a careful inspection. Therefore, we need to establish a balanced inspection and monitoring (monitering) strategy that is to establish quality process control points.


In order to ensure the normal operation of SMT equipment, strengthen the quality inspection of the processed workpieces in each process, so as to monitor its operating status, and establish quality control points after some key processes. These control points are usually established in the following locations:


1) PCB inspection

a. Whether the printed board is deformed; b. Whether the pad is oxidized; c. Whether the surface of the printed board is scratched;

Inspection method: visual inspection according to inspection standards.


2) Silk screen inspection

a. Is the printing complete; b. Is there any bridging; c. Is the thickness uniform; d. Is there any sag; e. Is there any deviation in the printing;

Inspection method: visual inspection according to inspection standards or inspection with magnifying glass.


3) Patch inspection

a. The placement position of the component; b. Whether there is a chip; c. whether there is a wrong part;

Inspection method: visual inspection according to inspection standards or inspection with magnifying glass.


4) Reflow soldering inspection

a. The soldering condition of the component, whether there are bad soldering phenomena such as bridging, tombstones, dislocation, solder balls, virtual soldering, etc. b. Soldering joints.

Inspection method: visual inspection according to inspection standards or inspection with magnifying glass.

Contact Us
Shenzhen Ledfocus Precision Manufacturing Co., Ltd.

Address: Room 1204, Dahong (Xinqiao) Science and Technology Innovation Park, No. 48, Xinyu Road, Shajing Street, Baoan District, Shenzhen

Phone: 0755-29727486 0755-83734215 0755-83734236

Person in charge: Mr. Fan 13088821718

Email: roman@leikashi.com

Business section #605

Email: allen@leikashi.com

Website: www.yhn567.com

Service hotline
0755-83734236
? 2020 Shenzhen Ledfocus Precision Manufacturing Co., Ltd. All rights reserved 粵ICP備2021139374號(hào)
  • Links:
清纯校花自慰呻吟流白浆| 女女百合av大片在线观看免费| 人人澡超碰碰97碰碰碰| 亚洲线精品一区二区三区影音先锋| 麻花豆传媒剧国产MV在线下| 欧美国产成人精品一区二区三区| 西西444www无码大胆| 欧美做爰又粗又大免费看 | 久久99久久99精品中文字幕| 久久久国产打桩机| 国产丰满老熟妇乱xxx1区| 国产无遮挡又黄又大又爽| 色视频www在线播放国产人成 | 亚洲av无码国产精品夜色午夜| 中国体育生gary飞机| 亚洲av国产爽歪歪无码| jizz国产精品| 善良的女房东味道2在线观看| 一本丁香综合久久久久不卡网站| 国产精品国产三级国产专区53| 日产欧产美韩系列| 欧美与黑人午夜性猛交久久久| 任你躁国语自产在线播放 | 亚洲av无码精品国产成人| 亚洲国产婷婷六月丁香| 色综合久久久久综合99| 最近中文字幕免费高清MV| 高级艳妇交换俱乐部小说| 国产免费一区二区在线a片视频| 女警察双腿大开呻吟| 乱人伦XXXX国语对白| 波多野结衣作品| 狠狠88综合久久久久综合网| 伊人久久大香线蕉AV不卡| 三人交free性欧美| 一本久久a久久精品亚洲| 无码人妻少妇伦在线电影| 一本色道久久综合无码人妻| 精品午夜福利在线观看| 国产亚洲精品无码AA在线观看| 人妻无码中文字幕免费视频蜜桃|